Documents

Approval Documents

The Moolarben Coal Project Stage 1 of the Moolarben Coal Complex has commenced and at full development will comprise three open cut mines (OC1, OC2, and OC3), a longwall underground mine (UG4), and mining related infrastructure (including coal processing and transport facilities).

The Moolarben Coal Project Stage 1 was approved under Part 3A of the EP&A Act by the NSW Minister for Planning on 6 September 2007 (Project Approval [05_0117]).  Fourteen Modifications to Project Approval (05_0117) have since been approved. The modifications were generally required to reconfigure the mine layout (e.g. extension to mining areas, relocation of coal handling infrastructure and water infrastructure) and were aimed to improve the efficiency and operation of the Moolarben Coal Complex and enable access to additional economically viable coal reserves. Further information on these modifications can be found below.

TitleLinkFile Size
Stage 1 Consolidated Project Approval4 MB
TitleLinkFile Size
Environmental Assessment – Table of Contents and Executive Summary306 KB
Environmental Assessment – Section 1 – Introduction896 KB
Environmental Assessment – Section 2 – Project Approval Framework99 KB
Environmental Assessment – Section 3 – Stakeholder and Community Consultation146 KB
Environmental Assessment – Section 4 – Project Description10 MB
Environmental Assessment – Section 5 – Existing Environment and Interactions32 MB
Environmental Assessment – Section 6 – Draft Statement of Commitments104 KB
Environmental Assessment – Section 7 – Project Justification and Conclusions196 KB
Environmental Assessment – Section 8 – References97 KB
Environmental Assessment – Section 9 – Abbreviations112 KB
EA – Plan 1 – Locality Plan422 KB
EA – Plan 2 – EL6288 & Development Application Area779 KB
EA – Plan 2a – Land Ownership32 KB
EA – Plan 3 – General Arrangement1 MB
EA – Plan 4 – Main Infrastructure Area701 KB
EA – Plan 5 – MCP at 6 months2 MB
EA – Plan 6 – MCP at 2 years2 MB
EA – Plan 7 – MCP at 5 years2 MB
EA – Plan 8 – MCP at 8 years2 MB
EA – Plan 9 – MCP at 10 years2 MB
EA – Plan 10 – Open Cut 1 Access & Conveyor Arrangement421 KB
EA – Plan 11 – Underground No. 4 Longwall Layout & Staging2 MB
EA – Plan 12 – Schematic of Proposed Water Management Strategy54 KB
EA – Plan 12a – Surface Water Management in Main Infrastructure Area422 KB
EA – Plan 13 – Environmental Baseline Monitoring Location738 KB
EA – Plan 14 -Year 2 – Predicted Annual Average PM10 Dust Emissions716 KB
EA – Plan 15 – Year 5 – Predicted Annual Average PM10 Dust Emissions742 KB
EA – Plan 16 – Year 8 – Predicted Annual Average PM10 Dust Emissions784 KB
EA – Plan 17 – Year 10 Predicted Annual Average PM10 Dust Emissions784 KB
EA – Plan 18 – Year 1 – Predicted LAeq(15 minute) Noise Levels -ENE wind658 KB
EA – Plan 19 – Year 2 – Predicted LAeq(15 minute) Noise Levels -ENE wind688 KB
EA – Plan 20 – Year 6 – Predicted LAeq(15 minute) Noise Levels -ENE wind685 KB
EA – Plan 21 – Year 8 – Predicted LAeq(15 minute) Noise Levels – Start of Pit 3 (inversion)706 KB
EA – Plan 22 – Year 10 – Predicted LAeq(15 minute) Noise Levels – End of Pit 3 (inversion)715 KB
EA – Plan 23 – Regional Hydrological Units3 MB
EA – Plan 24 – Existing Groundwater Levels Within Ulan Seam -Permian Coal Measures832 KB
EA – Plan 25 – Moolarben Groundwater Investigation Surficial Groundwater contours3 MB
EA – Plan 26 – Predicted Drawdowns – Ulan Seam at Completion of Mining (2022-2023)3 MB
EA – Plan 27 – Conceptual Stormwater Management at 6 months2 MB
EA – Plan 28 – Conceptual Stormwater Management at 10 Years5 MB
EA – Plan 29 – Surface Level Features Above Underground No. 41 MB
EA – Plan 30 – Predicted Subsidence Levels for Underground No. 4344 KB
EA – Plan 31 – Soil Type Boundaries1,017 KB
EA – Plan 32 – Land Capability1,018 KB
EA – Plan 33 – Agricultural Suitability1,020 KB
EA – Plan 35 – Vegetation Associations2 MB
EA – Plan 36 – Threatened Flora Species470 KB
EA – Plan 37 – Endangered Ecological Communities297 KB
EA – Plan 38 – Threatened Fauna Species516 KB
EA – Plan 39 – Preferred Final Land Use and Mitigation Strategy3 MB
EA – Plan 40 – Aboriginal Heritage Locations757 KB
EA – Plan 41 – European Heritage Locations639 KB
EA – Plan 42 – Visual Impact from Ulan Village661 KB
Appendix 1 – Director General’s Requirements101 KB
Appendix 2 – Newsletters447 KB
Appendix 3 – Air Quality2 MB
Appendix 3a – Health Risk Assessment303 KB
Appendix 4 – Noise and Blasting12 MB
Appendix 4a – Amendment Figure 1712 MB
Appendix 5 – Groundwater37 MB
Appendix 7 – Flooding8 MB
Appendix 8 – Subsidence15 MB
Appendix 9 – Soils, Land Capability and Agricultural Suitability8 MB
Appendix 10 – Geochemical334 KB
Appendix 11 – Flora, Fauna and Aquatic Ecology16 MB
Appendix 12 – Aboriginal Heritage7 MB
Appendix 13 – European Heritage5 MB
Appendix 14 – Socio-Economic Analysis340 KB
Appendix 15 – Traffic3 MB
Appendix 16 – Preliminary Hazard Analysis1 MB
Appendix 17 – Visual Impact17 MB
Response to Submissions3 MB
Response to Submissions Appendices 1 – 74 MB
Response to Submissions Appendices 8 – 96 MB
Response to Submissions Appendix 104 MB
Response to Submissions Appendix 113 MB
Response to Submissions Appendices 12 – 173 MB
IHAP Report747 KB
Addendum to IHAP Report88 KB
Director General’s Report2 MB
TitleLinkFile Size
Environmental Assessment4 MB
Modification Approval.980 KB
Response to Submissions443 KB
Assessment Report11 MB
Notice of Modification980 KB
TitleLinkFile Size
Environmental Assessment7 MB
Assessment Report3 MB
Notice of Modification405 KB
TitleLinkFile Size
Director General’s Requirements – Stage 1 Modification 31,013 KB
TitleLinkFile Size
Environmental Assessment4 MB
Appendix 1 – Approval3 MB
Appendix 2 – Air Quality472 KB
Appendix 3 – Acoustics61 KB
Appendix 4 – Flora and Fauna Assessment4 MB
Appendix 5 – Archaeology11 MB
Appendix 6 – Visuals481 KB
Assessment Report3 MB
Notice of Modification4 MB
TitleLinkFile Size
Environmental Assessment1 MB
Appendices 1 – 3 Stage 1 Modification 52 MB
Appendix 4a – Stage 1 Modification 58 MB
Appendix 4b – Stage 1 Modification 52 MB
Plans Stage 1 Modification 53 MB
Response to Submissions151 KB
Assessment Report3 MB
Notice of Modification6 MB
TitleLinkFile Size
Environmental Assessment4 MB
Assessment Report3 MB
Notice of Modification446 KB
TitleLinkFile Size
Environmental Assessment – Part A950 KB
Environmental Assessment – Part B9 MB
Environmental Assessment – Part C1 MB
Response to Submissions629 KB
Assessment Report3 MB
Notice of Modification28 MB
TitleLinkFile Size
Environmental Assessment3 MB
Assessment Report3 MB
Notice of Modification
TitleLinkFile Size
Environmental Assessment – Vol 1 – Main Report5 MB
Environmental Assessment – Vol 2 – Appendices A-C Noise & Vibration Impact Assessment4 MB
Environmental Assessment – Vol 2 – Appendix D Air Quality and Greenhouse Gas Assessment7 MB
Environmental Assessment – Vol 2 – Appendix E Ecological Impact Assessment6 MB
Environmental Assessment – Vol 3 – Appendix F-G Part 1 of 3 Aboriginal Heritage Impact Assessment4 MB
Environmental Assessment – Vol 3 – Appendix F-G Part 2 of 3 Previously Recorded Aboriginal Site Records7 MB
Environmental Assessment – Vol 3 – Appendix F-G Part 3 of 3 Historic Heritage Impact Assessment688 KB
Environmental Assessment – Vol 4 – Appendices H-I Visual Impact Assessment, Surface Water Impact Assessment6 MB
Environmental Assessment – Vol 4 – Appendices J-L Groundwater Impact Assessment, Soils and Agricultural Impact Assessment, Economic Impact Assessment7 MB
Response to Submissions9 MB
Director General’s Report26 MB
Planning and Assessment Commission Report74 KB
Notice of Modification2 MB
TitleLinkFile Size
Environmental Assessment1 MB
Assessment Report2 MB
Notice of Modification70 KB
TitleLinkFile Size
Environmental Assessment16 MB
Appendix A – Noise Assessment9 MB
Appendix B – Air Quality Assessment5 MB
Appendix C – Fora and Fauna Assessment2 MB
Appendix D – Surface Water Assessment Review1 MB
Appendix E – Aboriginal Cultural Heritage Assessment4 MB
Response to Submissions492 KB
Assessment Report10 MB
Notice of Modification2 MB
TitleLinkFile Size
Assessment Report2 MB
Environmental Assessment7 MB
Appendix A – Subsidence Assessment6 MB
Appendix A – Subsidence Assessment Part B6 MB
Appendix A – Groundwater Assessment9 MB
Appendix C – Noise Assessment7 MB
Appendix D – Air Quality Assessment9 MB
Appendix E – Flora and Fauna Impact Assessment4 MB
Appendix F – Surface Water Assessment Review3 MB
Appendix H – Road Transport Assessment5 MB
Appendix I – Community Infrastructure Assessment9 MB
Response to Submissions7 MB
Notice of Modification2 MB
TitleLinkFile Size
Temporary Coal Washing Limit Increase Modification943 KB
TitleLinkFile Size
Executive Summary9 MB
Environmental Assessment9 MB
Attachment 1 ‐ Secretary’s Environmental Assessment Requirements250 KB
Attachment 2 ‐ Stage 1 Project Approval4 MB
Attachment 3 ‐ Stage 2 Project Approval3 MB
Appendix A ‐ Noise Assessment3 MB
Appendix B ‐ Air Quality Assessment4 MB
Appendix C ‐ Biodiversity Assessment6 MB
Appendix D ‐ Aboriginal Cultural Heritage Assessment9 MB
Appendix E ‐ Site Water Balance and Surface Water Impact Assessment5 MB
Appendix F ‐ Controlled Water Release Impact Assessment2 MB
Appendix G ‐ Aquatic Ecology Assessment17 MB
Appendix H ‐ Geochemistry Review2 MB
Appendix I ‐ Groundwater Assessment6 MB
Response to Submissions4 MB
Open Cut Optimisation Modification Approval2 MB
Assessment Report15 MB
Determination Report784 KB
TitleLinkFile Size
Modification Report13 MB
Appendix A – Aboriginal Cultural Heritage Assessment6 MB
Appendix B – Biodiversity Development Assessment Report14 MB
Appendix C – Flooding Review16 MB
Appendix D – Surface Water Review6 MB
Appendix E – Noise Review6 MB
Appendix F – Air Quality Review.7 MB
Appendix G – Road Transport Review3 MB
Appendix H – Groundwater Review6 MB
Notice of Modification1 MB
TitleLinkFile Size
Assessment Report2 MB
Instrument of Modification2 MB
TitleLinkFile Size
Stage 2 Consolidated Project Approval4 MB
TitleLinkFile Size
Environmental Assessment – Table of Contents3 MB
Environmental Assessment – Executive Summary577 KB
Environmental Assessment – Abbreviations299 KB
Environmental Assessment – Glossary280 KB
Environmental Assessment – Section 1 – Introduction471 KB
Environmental Assessment – Section 2 – Project Approval Framework396 KB
Environmental Assessment – Section 3 – Stakeholder and Community Consultation299 KB
Environmental Assessment – Section 4 – Project Description3 MB
Environmental Assessment – Section 5 – Impact Assessment4 MB
Environmental Assessment – Section 6 – Statement of Commitments by MCM457 KB
Environmental Assessment – Section 7 – Project Justification455 KB
Environmental Assessment – Section 8 – References262 KB
Plan 1 – Regional Setting of the Moolarben Coal Project374 KB
Plan 2 – Local Setting of the Proposed Stage 2 Project and Property Ownership621 KB
Plan 02A – Land Ownership Details19 KB
Plan 03 – Approved Stage 1 General Arrangement1 MB
Plan 04 – Proposed Stage 2 General Arrangement1 MB
Plan 05 – Proposed Open Cut 4 Mine Layout at Year 2
Plan 06 – Proposed Open Cut 4 Mine Layout at Year 71 MB
Plan 07 – Proposed Open Cut Mine Layout at Year 121 MB
Plan 08 – Proposed Open Cut 4 Mine Layout at Year 161 MB
Plan 09 – Proposed Open Cut Mine Layout at Year 191 MB
Plan 10 – Proposed Open Cut Mine Layout at Year 241 MB
Plan 11 – Underground No.1 and No.2 Mining Schedule1 MB
Plan 13 – Elevations of the Stage 2 Infrastructure Area2 MB
Plan 14 – Plan and Elevation of the Stage 2 Facilities3 MB
Plan 15 – Water Management Strategy367 KB
Plan 16 – Environmental Monitoring and Weather Station Locations732 KB
Plan 17 – Year 2 – Predicted Annual Average PM10 Dust Emissions (cumulative)2 MB
Plan 18 – Year 7 – Predicted Annual Average PM10 Dust Emissions (cumulative)2 MB
Plan 19 – Year 12 – Predicted Annual Average PM10 Dust Emissions (cumulative)2 MB
Plan 20 – Year 16 – Predicted Annual Average PM10 Dust Emissions (cumulative)2 MB
Plan 21 – Year 19 – Predicted Annual Average PM10 Dust Emissions (cumulative)2 MB
Plan 22 – Year 24 – Predicted Annual Average PM10 Dust Emissions (cumulative)618 KB
Plan 23 – Year 2 – Predicted Noise Contours LAeq(15 minute) – ENE Wind725 KB
Plan 24 – Year 7 – Predicted Noise Contours LAeq(15 minute) – ENE Wind2 MB
Plan 25 – Year 12 – Predicted Noise Contours LAeq(15 minute) – ENE Wind2 MB
Plan 26 – Year 16 – Predicted Noise Contours LAeq(15 minute) – ENE Wind2 MB
Plan 27 – Year 19 – Predicted Noise Contours LAeq(15 minute) – ENE Wind735 KB
Plan 28 – Year 24 – Predicted Noise Contours LAeq(15 minute) – ENE Wind695 KB
Plan 29 – Water Census Location1 MB
Plan 30 – Hydrogeological Units and Piezometers
Plan 31 – Proposed Borefield Layout for Stages 1 and 2137 KB
Plan 32 – Groundwater Conceptual Model and Boundary Conditions2 MB
Plan 33 – Predicted Drawdowns in the Ulan Seam at Completion of Mining417 KB
Plan 34 – Catchment Surface Water Hydrology651 KB
Plan 35 – Surface Water Management of the Infrastructure Area3 MB
Plan 36 – Surface Water Management for Years 1-21 MB
Plan 37 – Surface Water Management for Year 121 MB
Plan 38 – Surface Water Management for Year 191 MB
Plan 39 – Surface Water Management for Year 241 MB
Plan 40 – Cross Sections of Post Mining Creek Alignments290 KB
Plan 41 – Cross Section of Typical Creek Riffle Structure274 KB
Plan 42 – Endangered Ecological Communities within Study Area1 MB
Plan 43 – Broad Vegetation Communities1 MB
Plan 44 – Threatened Flora Species of the Locality115 KB
Plan 45 – Threatened Fauna Species of the Locality130 KB
Plan 46 – Slopes and Cliff Lines Above Underground No.1 and Underground No.2323 KB
Plan 47 – Heritage Sites and Survey Marks above Underground No.1 and Underground No.2248 KB
Plan 48 – Predicted Subsidence Levels for Underground No.1 and Underground No.2634 KB
Plan 49 – Aboriginal Heritage Locations1 MB
Plan 50 – European Heritage Location505 KB
Plan 51 – Soil Type Boundaries965 KB
Plan 52 – Land Capability930 KB
Plan 53 – Agricultural Suitability969 KB
Plan 54 – Conceptual Post Mining Landscape591 KB
Plan 55 – Connectivity, Conservation and Dedication538 KB
Appendix 01A – Land Schedule3 MB
Appendix 01B – Director General’s Requirements – Stage 23 MB
Appendix 01C – Director General’s Requirements – 05 0117 MOD36 MB
Appendix 02A – MCP Newsletters 1 to 65 MB
Appendix 02B – Mine Dust Fact Sheet226 KB
Appendix 04 – Noise and Vibration Impact Assessment22 MB
Appendix 03A – Air Quality Assessment 096 MB
Appendix 03B – Greenhouse Gas Report351 KB
Appendix 06B – Revised Water Balance
Appendix 07 – Ecological Impact Assessment12 MB
Appendix 08 – Subsidence13 MB
Appendix 09 – Aboriginal Cultural Heritage Assessment37 MB
Appendix 10 – European Heritage3 MB
Appendix 11 – Soils12 MB
Appendix 12 – Road Traffic Report1 MB
Appendix 13 – Rail Traffic Report4 MB
Appendix 14 – Visuals Report1 MB
Appendix 15 – Economics554 KB
Appendix 16 – Preliminary Hazard Analysis2 MB
Appendix 17 – Geo-Chemical Assessment3 MB
Preferred Project Report – Main Report – Part A15 MB
Preferred Project Report – Main Report – Part B13 MB
PPR Appendix A – Table of Submissions319 KB
PPR Appendix B – Stakeholder Consultation449 KB
PPR Appendix C – Air Quality Impact Assessment5 MB
PPR Appendix D – Environmental Noise Assessment2 MB
PPR Appendix E – Groundwater Impact Assessment – Part A14 MB
PPR Appendix E – Groundwater Impact Assessment – Part B