Documents
Approval Documents
Stage 1 Project Approval [05_0117]
The Moolarben Coal Project Stage 1 of the Moolarben Coal Complex has commenced and at full development will comprise three open cut mines (OC1, OC2, and OC3), a longwall underground mine (UG4), and mining related infrastructure (including coal processing and transport facilities).
The Moolarben Coal Project Stage 1 was approved under Part 3A of the EP&A Act by the NSW Minister for Planning on 6 September 2007 (Project Approval [05_0117]). Fourteen Modifications to Project Approval (05_0117) have since been approved. The modifications were generally required to reconfigure the mine layout (e.g. extension to mining areas, relocation of coal handling infrastructure and water infrastructure) and were aimed to improve the efficiency and operation of the Moolarben Coal Complex and enable access to additional economically viable coal reserves. Further information on these modifications can be found below.
Stage 1 Project Approval Modifications
Stage 1 Project Approval
Title | Link | File Size |
---|---|---|
Environmental Assessment – Table of Contents and Executive Summary | 306 KB | |
Environmental Assessment – Section 1 – Introduction | 896 KB | |
Environmental Assessment – Section 2 – Project Approval Framework | 99 KB | |
Environmental Assessment – Section 3 – Stakeholder and Community Consultation | 146 KB | |
Environmental Assessment – Section 4 – Project Description | 10 MB | |
Environmental Assessment – Section 5 – Existing Environment and Interactions | 32 MB | |
Environmental Assessment – Section 6 – Draft Statement of Commitments | 104 KB | |
Environmental Assessment – Section 7 – Project Justification and Conclusions | 196 KB | |
Environmental Assessment – Section 8 – References | 97 KB | |
Environmental Assessment – Section 9 – Abbreviations | 112 KB | |
EA – Plan 1 – Locality Plan | 422 KB | |
EA – Plan 2 – EL6288 & Development Application Area | 779 KB | |
EA – Plan 2a – Land Ownership | 32 KB | |
EA – Plan 3 – General Arrangement | 1 MB | |
EA – Plan 4 – Main Infrastructure Area | 701 KB | |
EA – Plan 5 – MCP at 6 months | 2 MB | |
EA – Plan 6 – MCP at 2 years | 2 MB | |
EA – Plan 7 – MCP at 5 years | 2 MB | |
EA – Plan 8 – MCP at 8 years | 2 MB | |
EA – Plan 9 – MCP at 10 years | 2 MB | |
EA – Plan 10 – Open Cut 1 Access & Conveyor Arrangement | 421 KB | |
EA – Plan 11 – Underground No. 4 Longwall Layout & Staging | 2 MB | |
EA – Plan 12 – Schematic of Proposed Water Management Strategy | 54 KB | |
EA – Plan 12a – Surface Water Management in Main Infrastructure Area | 422 KB | |
EA – Plan 13 – Environmental Baseline Monitoring Location | 738 KB | |
EA – Plan 14 -Year 2 – Predicted Annual Average PM10 Dust Emissions | 716 KB | |
EA – Plan 15 – Year 5 – Predicted Annual Average PM10 Dust Emissions | 742 KB | |
EA – Plan 16 – Year 8 – Predicted Annual Average PM10 Dust Emissions | 784 KB | |
EA – Plan 17 – Year 10 Predicted Annual Average PM10 Dust Emissions | 784 KB | |
EA – Plan 18 – Year 1 – Predicted LAeq(15 minute) Noise Levels -ENE wind | 658 KB | |
EA – Plan 19 – Year 2 – Predicted LAeq(15 minute) Noise Levels -ENE wind | 688 KB | |
EA – Plan 20 – Year 6 – Predicted LAeq(15 minute) Noise Levels -ENE wind | 685 KB | |
EA – Plan 21 – Year 8 – Predicted LAeq(15 minute) Noise Levels – Start of Pit 3 (inversion) | 706 KB | |
EA – Plan 22 – Year 10 – Predicted LAeq(15 minute) Noise Levels – End of Pit 3 (inversion) | 715 KB | |
EA – Plan 23 – Regional Hydrological Units | 3 MB | |
EA – Plan 24 – Existing Groundwater Levels Within Ulan Seam -Permian Coal Measures | 832 KB | |
EA – Plan 25 – Moolarben Groundwater Investigation Surficial Groundwater contours | 3 MB | |
EA – Plan 26 – Predicted Drawdowns – Ulan Seam at Completion of Mining (2022-2023) | 3 MB | |
EA – Plan 27 – Conceptual Stormwater Management at 6 months | 2 MB | |
EA – Plan 28 – Conceptual Stormwater Management at 10 Years | 5 MB | |
EA – Plan 29 – Surface Level Features Above Underground No. 4 | 1 MB | |
EA – Plan 30 – Predicted Subsidence Levels for Underground No. 4 | 344 KB | |
EA – Plan 31 – Soil Type Boundaries | 1,017 KB | |
EA – Plan 32 – Land Capability | 1,018 KB | |
EA – Plan 33 – Agricultural Suitability | 1,020 KB | |
EA – Plan 35 – Vegetation Associations | 2 MB | |
EA – Plan 36 – Threatened Flora Species | 470 KB | |
EA – Plan 37 – Endangered Ecological Communities | 297 KB | |
EA – Plan 38 – Threatened Fauna Species | 516 KB | |
EA – Plan 39 – Preferred Final Land Use and Mitigation Strategy | 3 MB | |
EA – Plan 40 – Aboriginal Heritage Locations | 757 KB | |
EA – Plan 41 – European Heritage Locations | 639 KB | |
EA – Plan 42 – Visual Impact from Ulan Village | 661 KB | |
Appendix 1 – Director General’s Requirements | 101 KB | |
Appendix 2 – Newsletters | 447 KB | |
Appendix 3 – Air Quality | 2 MB | |
Appendix 3a – Health Risk Assessment | 303 KB | |
Appendix 4 – Noise and Blasting | 12 MB | |
Appendix 4a – Amendment Figure 17 | 12 MB | |
Appendix 5 – Groundwater | 37 MB | |
Appendix 7 – Flooding | 8 MB | |
Appendix 8 – Subsidence | 15 MB | |
Appendix 9 – Soils, Land Capability and Agricultural Suitability | 8 MB | |
Appendix 10 – Geochemical | 334 KB | |
Appendix 11 – Flora, Fauna and Aquatic Ecology | 16 MB | |
Appendix 12 – Aboriginal Heritage | 7 MB | |
Appendix 13 – European Heritage | 5 MB | |
Appendix 14 – Socio-Economic Analysis | 340 KB | |
Appendix 15 – Traffic | 3 MB | |
Appendix 16 – Preliminary Hazard Analysis | 1 MB | |
Appendix 17 – Visual Impact | 17 MB | |
Response to Submissions | 3 MB | |
Response to Submissions Appendices 1 – 7 | 4 MB | |
Response to Submissions Appendices 8 – 9 | 6 MB | |
Response to Submissions Appendix 10 | 4 MB | |
Response to Submissions Appendix 11 | 3 MB | |
Response to Submissions Appendices 12 – 17 | 3 MB | |
IHAP Report | 747 KB | |
Addendum to IHAP Report | 88 KB | |
Director General’s Report | 2 MB |
Stage 1 Modification 1
Stage 1 Modification 2
Stage 1 Modification 3
Stage 1 Modification 4
Stage 1 Modification 5
Stage 1 Modification 6
Stage 1 Modification 7
Stage 1 Modification 8
Stage 1 Modification 9
Title | Link | File Size |
---|---|---|
Environmental Assessment – Vol 1 – Main Report | 5 MB | |
Environmental Assessment – Vol 2 – Appendices A-C Noise & Vibration Impact Assessment | 4 MB | |
Environmental Assessment – Vol 2 – Appendix D Air Quality and Greenhouse Gas Assessment | 7 MB | |
Environmental Assessment – Vol 2 – Appendix E Ecological Impact Assessment | 6 MB | |
Environmental Assessment – Vol 3 – Appendix F-G Part 1 of 3 Aboriginal Heritage Impact Assessment | 4 MB | |
Environmental Assessment – Vol 3 – Appendix F-G Part 2 of 3 Previously Recorded Aboriginal Site Records | 7 MB | |
Environmental Assessment – Vol 3 – Appendix F-G Part 3 of 3 Historic Heritage Impact Assessment | 688 KB | |
Environmental Assessment – Vol 4 – Appendices H-I Visual Impact Assessment, Surface Water Impact Assessment | 6 MB | |
Environmental Assessment – Vol 4 – Appendices J-L Groundwater Impact Assessment, Soils and Agricultural Impact Assessment, Economic Impact Assessment | 7 MB | |
Response to Submissions | 9 MB | |
Director General’s Report | 26 MB | |
Planning and Assessment Commission Report | 74 KB | |
Notice of Modification | 2 MB |
Stage 1 Modification 10
Stage 1 Modification 11
Title | Link | File Size |
---|---|---|
Environmental Assessment | 16 MB | |
Appendix A – Noise Assessment | 9 MB | |
Appendix B – Air Quality Assessment | 5 MB | |
Appendix C – Fora and Fauna Assessment | 2 MB | |
Appendix D – Surface Water Assessment Review | 1 MB | |
Appendix E – Aboriginal Cultural Heritage Assessment | 4 MB | |
Response to Submissions | 492 KB | |
Assessment Report | 10 MB | |
Notice of Modification | 2 MB |
Stage 1 Modification 12
Title | Link | File Size |
---|---|---|
Assessment Report | 2 MB | |
Environmental Assessment | 7 MB | |
Appendix A – Subsidence Assessment | 6 MB | |
Appendix A – Subsidence Assessment Part B | 6 MB | |
Appendix A – Groundwater Assessment | 9 MB | |
Appendix C – Noise Assessment | 7 MB | |
Appendix D – Air Quality Assessment | 9 MB | |
Appendix E – Flora and Fauna Impact Assessment | 4 MB | |
Appendix F – Surface Water Assessment Review | 3 MB | |
Appendix H – Road Transport Assessment | 5 MB | |
Appendix I – Community Infrastructure Assessment | 9 MB | |
Response to Submissions | 7 MB | |
Notice of Modification | 2 MB |
Stage 1 Modification 14
Title | Link | File Size |
---|---|---|
Executive Summary | 9 MB | |
Environmental Assessment | 9 MB | |
Attachment 1 ‐ Secretary’s Environmental Assessment Requirements | 250 KB | |
Attachment 2 ‐ Stage 1 Project Approval | 4 MB | |
Attachment 3 ‐ Stage 2 Project Approval | 3 MB | |
Appendix A ‐ Noise Assessment | 3 MB | |
Appendix B ‐ Air Quality Assessment | 4 MB | |
Appendix C ‐ Biodiversity Assessment | 6 MB | |
Appendix D ‐ Aboriginal Cultural Heritage Assessment | 9 MB | |
Appendix E ‐ Site Water Balance and Surface Water Impact Assessment | 5 MB | |
Appendix F ‐ Controlled Water Release Impact Assessment | 2 MB | |
Appendix G ‐ Aquatic Ecology Assessment | 17 MB | |
Appendix H ‐ Geochemistry Review | 2 MB | |
Appendix I ‐ Groundwater Assessment | 6 MB | |
Response to Submissions | 4 MB | |
Open Cut Optimisation Modification Approval | 2 MB | |
Assessment Report | 15 MB | |
Determination Report | 784 KB |
Stage 1 Modification 15
Title | Link | File Size |
---|---|---|
Modification Report | 13 MB | |
Appendix A – Aboriginal Cultural Heritage Assessment | 6 MB | |
Appendix B – Biodiversity Development Assessment Report | 14 MB | |
Appendix C – Flooding Review | 16 MB | |
Appendix D – Surface Water Review | 6 MB | |
Appendix E – Noise Review | 6 MB | |
Appendix F – Air Quality Review. | 7 MB | |
Appendix G – Road Transport Review | 3 MB | |
Appendix H – Groundwater Review | 6 MB | |
Notice of Modification | 1 MB |
Stage 2 Project Approval Modifications
Stage 2 Project Approval
Title | Link | File Size |
---|---|---|
Environmental Assessment – Table of Contents | 3 MB | |
Environmental Assessment – Executive Summary | 577 KB | |
Environmental Assessment – Abbreviations | 299 KB | |
Environmental Assessment – Glossary | 280 KB | |
Environmental Assessment – Section 1 – Introduction | 471 KB | |
Environmental Assessment – Section 2 – Project Approval Framework | 396 KB | |
Environmental Assessment – Section 3 – Stakeholder and Community Consultation | 299 KB | |
Environmental Assessment – Section 4 – Project Description | 3 MB | |
Environmental Assessment – Section 5 – Impact Assessment | 4 MB | |
Environmental Assessment – Section 6 – Statement of Commitments by MCM | 457 KB | |
Environmental Assessment – Section 7 – Project Justification | 455 KB | |
Environmental Assessment – Section 8 – References | 262 KB | |
Plan 1 – Regional Setting of the Moolarben Coal Project | 374 KB | |
Plan 2 – Local Setting of the Proposed Stage 2 Project and Property Ownership | 621 KB | |
Plan 02A – Land Ownership Details | 19 KB | |
Plan 03 – Approved Stage 1 General Arrangement | 1 MB | |
Plan 04 – Proposed Stage 2 General Arrangement | 1 MB | |
Plan 05 – Proposed Open Cut 4 Mine Layout at Year 2 | ||
Plan 06 – Proposed Open Cut 4 Mine Layout at Year 7 | 1 MB | |
Plan 07 – Proposed Open Cut Mine Layout at Year 12 | 1 MB | |
Plan 08 – Proposed Open Cut 4 Mine Layout at Year 16 | 1 MB | |
Plan 09 – Proposed Open Cut Mine Layout at Year 19 | 1 MB | |
Plan 10 – Proposed Open Cut Mine Layout at Year 24 | 1 MB | |
Plan 11 – Underground No.1 and No.2 Mining Schedule | 1 MB | |
Plan 13 – Elevations of the Stage 2 Infrastructure Area | 2 MB | |
Plan 14 – Plan and Elevation of the Stage 2 Facilities | 3 MB | |
Plan 15 – Water Management Strategy | 367 KB | |
Plan 16 – Environmental Monitoring and Weather Station Locations | 732 KB | |
Plan 17 – Year 2 – Predicted Annual Average PM10 Dust Emissions (cumulative) | 2 MB | |
Plan 18 – Year 7 – Predicted Annual Average PM10 Dust Emissions (cumulative) | 2 MB | |
Plan 19 – Year 12 – Predicted Annual Average PM10 Dust Emissions (cumulative) | 2 MB | |
Plan 20 – Year 16 – Predicted Annual Average PM10 Dust Emissions (cumulative) | 2 MB | |
Plan 21 – Year 19 – Predicted Annual Average PM10 Dust Emissions (cumulative) | 2 MB | |
Plan 22 – Year 24 – Predicted Annual Average PM10 Dust Emissions (cumulative) | 618 KB | |
Plan 23 – Year 2 – Predicted Noise Contours LAeq(15 minute) – ENE Wind | 725 KB | |
Plan 24 – Year 7 – Predicted Noise Contours LAeq(15 minute) – ENE Wind | 2 MB | |
Plan 25 – Year 12 – Predicted Noise Contours LAeq(15 minute) – ENE Wind | 2 MB | |
Plan 26 – Year 16 – Predicted Noise Contours LAeq(15 minute) – ENE Wind | 2 MB | |
Plan 27 – Year 19 – Predicted Noise Contours LAeq(15 minute) – ENE Wind | 735 KB | |
Plan 28 – Year 24 – Predicted Noise Contours LAeq(15 minute) – ENE Wind | 695 KB | |
Plan 29 – Water Census Location | 1 MB | |
Plan 30 – Hydrogeological Units and Piezometers | ||
Plan 31 – Proposed Borefield Layout for Stages 1 and 2 | 137 KB | |
Plan 32 – Groundwater Conceptual Model and Boundary Conditions | 2 MB | |
Plan 33 – Predicted Drawdowns in the Ulan Seam at Completion of Mining | 417 KB | |
Plan 34 – Catchment Surface Water Hydrology | 651 KB | |
Plan 35 – Surface Water Management of the Infrastructure Area | 3 MB | |
Plan 36 – Surface Water Management for Years 1-2 | 1 MB | |
Plan 37 – Surface Water Management for Year 12 | 1 MB | |
Plan 38 – Surface Water Management for Year 19 | 1 MB | |
Plan 39 – Surface Water Management for Year 24 | 1 MB | |
Plan 40 – Cross Sections of Post Mining Creek Alignments | 290 KB | |
Plan 41 – Cross Section of Typical Creek Riffle Structure | 274 KB | |
Plan 42 – Endangered Ecological Communities within Study Area | 1 MB | |
Plan 43 – Broad Vegetation Communities | 1 MB | |
Plan 44 – Threatened Flora Species of the Locality | 115 KB | |
Plan 45 – Threatened Fauna Species of the Locality | 130 KB | |
Plan 46 – Slopes and Cliff Lines Above Underground No.1 and Underground No.2 | 323 KB | |
Plan 47 – Heritage Sites and Survey Marks above Underground No.1 and Underground No.2 | 248 KB | |
Plan 48 – Predicted Subsidence Levels for Underground No.1 and Underground No.2 | 634 KB | |
Plan 49 – Aboriginal Heritage Locations | 1 MB | |
Plan 50 – European Heritage Location | 505 KB | |
Plan 51 – Soil Type Boundaries | 965 KB | |
Plan 52 – Land Capability | 930 KB | |
Plan 53 – Agricultural Suitability | 969 KB | |
Plan 54 – Conceptual Post Mining Landscape | 591 KB | |
Plan 55 – Connectivity, Conservation and Dedication | 538 KB | |
Appendix 01A – Land Schedule | 3 MB | |
Appendix 01B – Director General’s Requirements – Stage 2 | 3 MB | |
Appendix 01C – Director General’s Requirements – 05 0117 MOD3 | 6 MB | |
Appendix 02A – MCP Newsletters 1 to 6 | 5 MB | |
Appendix 02B – Mine Dust Fact Sheet | 226 KB | |
Appendix 04 – Noise and Vibration Impact Assessment | 22 MB | |
Appendix 03A – Air Quality Assessment 09 | 6 MB | |
Appendix 03B – Greenhouse Gas Report | 351 KB | |
Appendix 06B – Revised Water Balance | ||
Appendix 07 – Ecological Impact Assessment | 12 MB | |
Appendix 08 – Subsidence | 13 MB | |
Appendix 09 – Aboriginal Cultural Heritage Assessment | 37 MB | |
Appendix 10 – European Heritage | 3 MB | |
Appendix 11 – Soils | 12 MB | |
Appendix 12 – Road Traffic Report | 1 MB | |
Appendix 13 – Rail Traffic Report | 4 MB | |
Appendix 14 – Visuals Report | 1 MB | |
Appendix 15 – Economics | 554 KB | |
Appendix 16 – Preliminary Hazard Analysis | 2 MB | |
Appendix 17 – Geo-Chemical Assessment | 3 MB | |
Preferred Project Report – Main Report – Part A | 15 MB | |
Preferred Project Report – Main Report – Part B | 13 MB | |
PPR Appendix A – Table of Submissions | 319 KB | |
PPR Appendix B – Stakeholder Consultation | 449 KB | |
PPR Appendix C – Air Quality Impact Assessment | 5 MB | |
PPR Appendix D – Environmental Noise Assessment | 2 MB | |
PPR Appendix E – Groundwater Impact Assessment – Part A | 14 MB | |
PPR Appendix E – Groundwater Impact Assessment – Part B |