Ashton Noise Monitoring Report November 2024 | 5 December 2024 | | 4 MB |
Ashton Annual Review 2023 | 5 December 2024 | | 22 MB |
Ashton 241205 EPL-Monitoring-Data-2012-2024 | 5 December 2024 | | 961 KB |
Ashton Mine Dust and You – Fact Sheet | 21 October 2024 | | 1 MB |
Ashton Noise Monitoring Report October 2024 | 21 October 2024 | | 3 MB |
Ashton Noise Monitoring Report September 2024 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report August 2024 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report July 2024 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report June 2024 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report May 2024 | 9 October 2024 | | 2 MB |
Ashton Noise Monitoring Report April 2024 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report March 2024 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report February 2024 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report January 2024 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report December 2023 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report November 2023 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report October 2023 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report September 2023 | 9 October 2024 | | 5 MB |
Ashton Noise Monitoring Report August 2023 | 9 October 2024 | | 5 MB |
Ashton Noise Monitoring Report July 2023 | 9 October 2024 | | 5 MB |
Ashton Noise Monitoring Report June 2023 | 9 October 2024 | | 5 MB |
Ashton Noise Monitoring Report May 2023 | 9 October 2024 | | 5 MB |
Ashton Noise Monitoring Report April 2023 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report March 2023 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report February 2023 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report January 2023 | 9 October 2024 | | 2 MB |
Ashton Noise Monitoring Report December 2022 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report November 2022 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report October 2022 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report September 2022 | 9 October 2024 | | 5 MB |
Ashton Noise Monitoring Report August 2022 | 9 October 2024 | | 5 MB |
Ashton Noise Monitoring Report July 2022 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report June 2022 | 9 October 2024 | | 6 MB |
Ashton Noise Monitoring Report May 2022 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report April 2022 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report March 2022 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report February 2022 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report January 2022 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report December 2021 | 9 October 2024 | | 6 MB |
Ashton Noise Monitoring Report November 2021 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report October 2021 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report September 2021 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report August 2021 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report July 2021 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report June 2021 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report May 2021 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report April 2021 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report March 2021 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report February 2021 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report January 2021 | 9 October 2024 | | 4 MB |
Ashton Noise Monitoring Report December 2020 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report November 2020 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report October 2020 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report September 2020 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report August 2020 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report July 2020 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report June 2020 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report May 2020 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report April 2020 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report March 2020 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report February 2020 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report January 2020 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report December 2019 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report November 2019 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report October 2019 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report September 2019 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report August 2019 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report July 2019 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report June 2019 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report May 2019 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report April 2019 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report March 2019 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report February 2019 | 9 October 2024 | | 3 MB |
Ashton Noise Monitoring Report January 2019 | 9 October 2024 | | 6 MB |
Ashton Noise Monitoring Report December 2018 | 8 October 2024 | | 7 MB |
Ashton Noise Monitoring Report November 2018 | 8 October 2024 | | 5 MB |
Ashton Noise Monitoring Report October 2018 | 8 October 2024 | | 3 MB |
Ashton Noise Monitoring Report September 2018 | 8 October 2024 | | 5 MB |
Ashton Noise Monitoring Report August 2018 | 8 October 2024 | | 5 MB |
Ashton Noise Monitoring Report July 2018 | 8 October 2024 | | 7 MB |
Ashton Noise Monitoring Report June 2018 | 8 October 2024 | | 3 MB |
Ashton Noise Monitoring Report April 2018 | 8 October 2024 | | 6 MB |
Ashton Noise Monitoring Report March 2018 | 8 October 2024 | | 1 MB |
Ashton Noise Monitoring Report February 2018 | 8 October 2024 | | 1 MB |
Ashton Noise Monitoring Report January 2018 | 8 October 2024 | | 5 MB |
Ashton Noise Monitoring Report December 2017 | 8 October 2024 | | 8 MB |
Ashton Noise Monitoring Report November 2017 | 8 October 2024 | | 3 MB |
Ashton Noise Monitoring Report October 2017 | 8 October 2024 | | 4 MB |
Ashton Noise Monitoring Report September 2017 | 8 October 2024 | | 3 MB |
Ashton Noise Monitoring Report August 2017 | 8 October 2024 | | 6 MB |
Ashton Noise Monitoring Report July 2017 | 8 October 2024 | | 3 MB |
Ashton Noise Monitoring Report June 2017 | 8 October 2024 | | 3 MB |
Ashton Noise Monitoring Report May 2017 | 8 October 2024 | | 1 MB |
Ashton Noise Monitoring Report April 2017 | 8 October 2024 | | 965 KB |
Ashton Noise Monitoring Report March 2017 | 8 October 2024 | | 758 KB |
Ashton Noise Monitoring Report February 2017 | 8 October 2024 | | 758 KB |
Ashton Noise Monitoring Report January 2017 | 8 October 2024 | | 758 KB |
Ashton Noise Monitoring Report December 2016 | 8 October 2024 | | 762 KB |
Ashton Noise Monitoring Report November 2016 | 8 October 2024 | | 761 KB |
Ashton Noise Monitoring Report October 2016 | 8 October 2024 | | 755 KB |
Ashton Noise Monitoring Report September 2016 | 8 October 2024 | | 378 KB |
Ashton Noise Monitoring Report August 2016 | 8 October 2024 | | 377 KB |
Ashton Noise Monitoring Report July 2016 | 8 October 2024 | | 383 KB |
Ashton Noise Monitoring Report June 2016 | 8 October 2024 | | 377 KB |
Ashton Annual Review 2022 | 7 October 2024 | | 25 MB |
Ashton Annual Review 2021 | 7 October 2024 | | 23 MB |
Ashton Annual Review 2020 | 7 October 2024 | | 9 MB |
Ashton Annual Review 2020 -Appendices | 7 October 2024 | | 20 MB |
Ashton Annual Review 2019 | 7 October 2024 | | 7 MB |
Ashton Annual Review 2019 -Appendices | 7 October 2024 | | 15 MB |
Ashton Annual Review 2018 | 7 October 2024 | | 11 MB |
Ashton Annual Review 2017 | 7 October 2024 | | 5 MB |
Ashton Annual Review 2016 | 7 October 2024 | | 10 MB |
Ashton AEMR 2015 | 7 October 2024 | | 13 MB |
Ashton AEMR 2014 | 7 October 2024 | | 35 MB |
Ashton AEMR 2013 | 7 October 2024 | | 17 MB |
Ashton AEMR Plans 2013 | 7 October 2024 | | 6 MB |
Ashton AEMR 2012 | 7 October 2024 | | 15 MB |
Ashton AEMR 2010 – 2011 | 7 October 2024 | | 26 MB |
Ashton AEMR 08-09 Appendices | 3 October 2024 | | 38 MB |
Ashton AEMR 2008-2009 Main Document | 3 October 2024 | | 13 MB |
Ashton AEMR 2007-2008 Appendices 1 to 6 | 3 October 2024 | | 4 MB |
Ashton AEMR 2007-2008 Appendix 7 | 3 October 2024 | | 8 MB |
Ashton AEMR 2007-2008 Main Document | 3 October 2024 | | 8 MB |
Ashton AEMR 2006 – 2007 Appendices | 3 October 2024 | | 4 MB |
Ashton AEMR 2006-2007 Main Text | 3 October 2024 | | 5 MB |
Ashton AEMR 2006-2007 Plans | 3 October 2024 | | 7 MB |
Ashton AEMR 2005-2006 Appendices | 3 October 2024 | | 6 MB |
Ashton AEMR 2005-2006 Main Text | 3 October 2024 | | 4 MB |
Ashton AEMR 2004-2005 | 3 October 2024 | | 11 MB |
Ashton Coal IEA 2022 | 3 October 2024 | | 5 MB |
Ashton Coal IEA 2019 | 3 October 2024 | | 8 MB |
Ashton Coal IEA -2016 | 3 October 2024 | | 3 MB |
Ashton IEA letter of response 2016 | 3 October 2024 | | 224 KB |
Ashton Independent Compliance Audit -2013 | 3 October 2024 | | 6 MB |
Ashton Independent Compliance Audit -2010 | 3 October 2024 | | 3 MB |
Ashton Independent Compliance Audit -2007 | 3 October 2024 | | 10 MB |
Ashton Independent Compliance Audit -2004 | 3 October 2024 | | 4 MB |
Ashton Water Management Plan -Appendix F | 2 October 2024 | | 4 MB |
Ashton Biodiversity Management Plan -Appendix E | 2 October 2024 | | 4 MB |
Ashton Ravensworth Underground Integration Modification site water balance Appendix D | 2 October 2024 | | 5 MB |
Ashton-Ravensworth Integration Project EPBC Appendix C -Groundwater Impact Assessment | 2 October 2024 | | 44 MB |
Ashton-RUM EPBC Appendix B -Subsidence Review | 2 October 2024 | | 8 MB |
Ashton-RUM EPBC Appendix A -Ecology Assessment | 2 October 2024 | | 9 MB |
Ashton-RUM EPBC Act Preliminary Documentation | 2 October 2024 | | 13 MB |
Ashton-RUM EPBC – Section 95B(4) Public Notice | 2 October 2024 | | 100 KB |
Ashton MOD-11 Rumex Appendix C Air Quality Review | 2 October 2024 | | 4 MB |
Ashton MOD-11 Rumex Appendix B – Site Water Balance | 2 October 2024 | | 5 MB |
Ashton MOD-11 Rumex Appendix A – Groundwater Review | 2 October 2024 | | 17 MB |
Ashton MOD-11 Rumex Ashton-Ravensworth UG Integration – Ashton Mod Report | 2 October 2024 | | 8 MB |
Ashton MOD-10 Central Gas Drainage And Associated Surface Infra_ EA Main Text | 2 October 2024 | | 20 MB |
Ashton MOD-10 Central Gas Drainage And Associated Surface Infra_ EA Appendix -9 | 2 October 2024 | | 2 MB |
Ashton MOD-10 Central Gas Drainage And Associated Surface Infra_ EA Appendix -8 | 2 October 2024 | | 4 MB |
Ashton MOD-10 Central Gas Drainage And Associated Surface Infra_ EA Appendix -7 | 2 October 2024 | | 4 MB |
Ashton MOD-10 Central Gas Drainage And Associated Surface Infra_ EA Appendix -6 | 2 October 2024 | | 2 MB |
Ashton MOD-10 Central Gas Drainage And Associated Surface Infra_ EA Appendix -5 | 2 October 2024 | | 4 MB |
Ashton MOD-10 Central Gas Drainage And Associated Surface Infra_ EA Appendix -4 | 2 October 2024 | | 19 MB |
Ashton MOD-10 Central Gas Drainage And Associated Surface Infra_ EA Appendix -3 | 2 October 2024 | | 2 MB |
Ashton MOD-10 Central Gas Drainage And Associated Surface Infra_ EA Appendix -2 | 2 October 2024 | | 2 MB |
Ashton MOD-10 Central Gas Drainage And Associated Surface Infra_ EA Appendix -1 | 2 October 2024 | | 1 MB |
Ashton MOD-9 EA Establishment of Upcast Vantilation Shaft Above The Underground Mine Response To Submissions | 2 October 2024 | | 4 MB |
Ashton MOD-9 EA Establishment of Upcast Vantilation Shaft Above The Underground Mine Appendices | 2 October 2024 | | 6 MB |
Ashton MOD-9 EA Establishment of Upcast Vantilation Shaft Above The Underground Mine | 2 October 2024 | | 5 MB |
Ashton MOD-8 Minor MOD to condition 1.20 to Schedule 2 _Letter-to-DoP_DA309-11-2001 | 2 October 2024 | | 5 MB |
Ashton MOD-7 EA Response to Submissions 290411 | 2 October 2024 | | 9 MB |
Ashton MOD-7 EA Response to Submissions 050511 | 2 October 2024 | | 9 MB |
Ashton MOD-7 EA Main Text | 2 October 2024 | | 997 KB |
Ashton MOD-7 EA Hebden Seam Recovery Appendices | 2 October 2024 | | 3 MB |
Ashton MOD-7 EA Gas Drainage Appendices | 2 October 2024 | | 6 MB |
Ashton MOD-6 Bowmans Creek EA Volume 3 A3 Plans (Part 2 -Engineering Design) | 2 October 2024 | | 8 MB |
Ashton MOD-6 Bowmans Creek EA Volume 3 A3 Plans (Part 1 – Project Overview) | 2 October 2024 | | 16 MB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 14_Traffic Impact Assessment | 2 October 2024 | | 1,021 KB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 13_Noise Assessment | 2 October 2024 | | 219 KB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 12_Air Quality Assessment | 2 October 2024 | | 115 KB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 11_Aboriginal Archaeological Assessment | 2 October 2024 | | 8 MB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 10_Landscape Design Report | 2 October 2024 | | 16 MB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 09_Riparian & AqEcol Report | 2 October 2024 | | 9 MB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 08_Water Balance Modelling | 2 October 2024 | | 8 MB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 07_Flood Hydrology & Geomorphology | 2 October 2024 | | 5 MB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 06_Flood Study | 2 October 2024 | | 27 MB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 05_Groundwater_011g_FINAL_Signed (Main text Sec1-5) | 2 October 2024 | | 31 MB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 05_Groundwater_011g_FINAL_Signed (Main text Sec 6-10) | 2 October 2024 | | 28 MB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 05_Groundwater_011g (Appendices) | 2 October 2024 | | 2 MB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 04_Subsidence_SCT | 2 October 2024 | | 13 MB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 03 – Existing ACP Consent and EPL | 2 October 2024 | | 882 KB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 02 Property Title DetailsA | 2 October 2024 | | 26 KB |
Ashton MOD-6 Bowmans Creek EA Volume 2 Appendix 01_Bowmans Creek Diversion DGRs Signed | 2 October 2024 | | 23 MB |
Ashton MOD-6 Bowmans Creek EA Volume 1 Bowmans Creek EA Main Text | 2 October 2024 | | 23 MB |
Ashton MOD-6 Bowmans Creek EA Response to Submissions Part -1 | 2 October 2024 | | 2 MB |
Ashton MOD-6 Bowmans Creek EA Response to Submissions Part -2 | 2 October 2024 | | 9 MB |
Ashton MOD-5 SEOC EA VOL5 Appendix 18 – Benefit Cost Analysis | 2 October 2024 | | 142 KB |
Ashton MOD-5 SEOC EA VOL5 Appendix 17 – Economic Benefits | 2 October 2024 | | 647 KB |
Ashton MOD-5 SEOC EA VOL5 Appendix 16 – Hazard and Risk | 2 October 2024 | | 6 MB |
Ashton MOD-5 SEOC EA VOL5 Appendix 15 – Transport | 2 October 2024 | | 3 MB |
Ashton MOD-5 SEOC EA VOL5 Appendix 14 – European Heritage | 2 October 2024 | | 18 MB |
Ashton MOD-5 SEOC EA VOL5 Appendix 13 – Aboriginal Heritage | 2 October 2024 | | 30 MB |
Ashton MOD-5 SEOC EA VOL5 Appendix 12 – Visual Impact Assessment | 2 October 2024 | | 20 MB |
Ashton MOD-5 SEOC EA VOL4 Appendix 11 – Aquatic Ecology | 2 October 2024 | | 6 MB |
Ashton MOD-5 SEOC EA VOL4 Appendix 10 – Flora and Fauna Assessment | 2 October 2024 | | 6 MB |
Ashton MOD-5 SEOC EA VOL4 Appendix 09 – Geochemistry | 2 October 2024 | | 3 MB |
Ashton MOD-5 SEOC EA VOL4 Appendix 08 – Soil Land Capability Agricultural Suitability | 2 October 2024 | | 2 MB |
Ashton MOD-5 SEOC EA VOL4 Appendix 07 – Glennies Creek Geomorphology | 2 October 2024 | | 6 MB |
Ashton MOD-5 SEOC EA VOL4 Appendix 06 – Surface Water and Flooding Assessment | 2 October 2024 | | 72 MB |
Ashton MOD-5 SEOC EA VOL3 Appendix 05 – Groundwater Assessment | 2 October 2024 | | 34 MB |
Ashton MOD-5 SEOC EA VOL3 Appendix 04 – Noise and Blasting Assessment | 2 October 2024 | | 38 MB |
Ashton MOD-5 SEOC EA VOL3 Appendix 03 – Air Quality and Greenhouse Gas Assessments | 2 October 2024 | | 24 MB |
Ashton MOD-5 SEOC EA VOL2 A3 PLANS PART D | 2 October 2024 | | 21 MB |
Ashton MOD-5 SEOC EA VOL2 A3 PLANS PART C | 2 October 2024 | | 26 MB |
Ashton MOD-5 SEOC EA VOL2 A3 PLANS PART B | 2 October 2024 | | 20 MB |
Ashton MOD-5 SEOC EA VOL2 A3 PLANS PART A | 2 October 2024 | | 19 MB |
Ashton MOD-5 SEOC EA VOL1 Appendix 02 – Existing ACP Consent and EPL | 2 October 2024 | | 919 KB |
Ashton MOD-5 SEOC EA VOL1 Appendix 01B | 2 October 2024 | | 655 KB |
Ashton MOD-5 SEOC EA VOL1 Appendix 01A – Property Schedule | 2 October 2024 | | 127 KB |
Ashton MOD-5 SEOC EA Section 8-9 | 1 October 2024 | | 179 KB |
Ashton MOD-5 SEOC EA Section 7 | 1 October 2024 | | 3 MB |
Ashton MOD-5 SEOC EA Section 6 | 1 October 2024 | | 150 KB |
Ashton MOD-5 SEOC EA Section 5 Part-B | 1 October 2024 | | 24 MB |
Ashton MOD-5 SEOC EA Section 5 Part-A | 1 October 2024 | | 31 MB |
Ashton MOD-5 SEOC EA Section 4 | 1 October 2024 | | 17 MB |
Ashton MOD-5 SEOC EA Section 3 | 1 October 2024 | | 177 KB |
Ashton MOD-5 SEOC EA Section 2 | 1 October 2024 | | 168 KB |
Ashton MOD-5 SEOC EA Section 1 | 1 October 2024 | | 4 MB |
Ashton MOD-5 SEOC EA Executive Summary | 1 October 2024 | | 1 MB |
Ashton MOD-5 SEOC EA Contents | 1 October 2024 | | 166 KB |
Ashton MOD-5 SEOC Response to Submissions | 1 October 2024 | | 40 MB |
Ashton MOD-5 SEOC Preliminary Environmental Assessment(EA) | 1 October 2024 | | 8 MB |
Ashton MOD-5 SouthEast Open Cut (SEOC) EA January 2011 Additional Information and Project Changes | 1 October 2024 | | 6 MB |
Ashton MOD-4 Extra Longwall -second response to submissions | 1 October 2024 | | 5 MB |
Ashton MOD-4 Extra Longwall J162_Longwall_Mod_240709 | 1 October 2024 | | 6 MB |
Ashton MOD-4 Extra Longwall Figure 5a_A3 | 1 October 2024 | | 2 MB |
Ashton MOD-4 Extra Longwall Fig_6a_A-9346 | 1 October 2024 | | 952 KB |
Ashton MOD-4 Extra Longwall Fig_6_A3_A-9347 | 1 October 2024 | | 2 MB |
Ashton MOD-4 Extra Longwall Appendix 8 – Noise | 1 October 2024 | | 57 KB |
Ashton MOD-4 Extra Longwall Appendix 7 – Air Quality[1] | 1 October 2024 | | 533 KB |
Ashton MOD-4 Extra Longwall Appendix 5 – Ecology[1] | 1 October 2024 | | 16 MB |
Ashton MOD-4 Extra Longwall Appendix 4 – Aquatic Ecology[1] | 1 October 2024 | | 493 KB |
Ashton MOD-4 Extra Longwall Appendix 3B – Impacts on Ravensworth UG[1] | 1 October 2024 | | 3 MB |
Ashton MOD-4 Extra Longwall Appendix 3A – Groundwater[1] | 1 October 2024 | | 9 MB |
Ashton MOD-4 Extra Longwall Appendix 2B- Subsidence Impacts on Narama Dam[1] | 1 October 2024 | | 796 KB |
Ashton MOD-4 Extra Longwall Appendix 2A – Subsidence[1] | 1 October 2024 | | 5 MB |
Ashton MOD-4 Extra Longwall Appendix 1 – DGR’s[1] | 1 October 2024 | | 324 KB |
Ashton MOD-4 Extra Longwall A-9344 5_A3_600dpi[1] | 1 October 2024 | | 1 MB |
Ashton MOD-4 Extra Longwall A-9339 Fig2_A4_300dpi[1] | 1 October 2024 | | 17 MB |
Ashton MOD-4 Extra Longwall A-9229 3_A3_300dpi[1] | 1 October 2024 | | 34 MB |
Ashton MOD-3 Tailings Emplacement Statement of Environmental Effects | 1 October 2024 | | 2 MB |
Ashton MOD-3 Tailings Emplacement Modification Application Document | 1 October 2024 | | 11 MB |
Ashton MOD-2 Raise Eastern Emplacement Area | 1 October 2024 | | 160 KB |
Ashton MOD-2 Raise Eastern Emplacement Area 2004 -Appendix 4 Fig-3 | 1 October 2024 | | 135 KB |
Ashton MOD-2 Raise Eastern Emplacement Area 2004 -Appendix 4 Fig-2 | 1 October 2024 | | 137 KB |
Ashton MOD-2 Raise Eastern Emplacement Area 2004 -Appendix 4 Fig-1 | 1 October 2024 | | 107 KB |
Ashton MOD-2 Raise Eastern Emplacement Area 2004 -Appendix 4 | 1 October 2024 | | 90 KB |
Ashton MOD-2 Raise Eastern Emplacement Area 2004 -Appendix 3 | 1 October 2024 | |